Project Overview
This project involved the renovation of the main bathroom and downstairs toilet at a property on St. Lawrence Park in Chepstow. The work covered decommissioning, plumbing, construction, tiling, flooring, plastering and electrical improvements.
Bathroom and Plumbing Works
The existing bathroom and downstairs toilet were decommissioned, with the tiled bathroom walls removed in preparation for the new installation. First- and second-fix plumbing work was completed, including the replacement of an existing valve within the cylinder cupboard and the safe capping of redundant gas pipework.
Construction and Wall Finishes
New backer boards were installed to provide a suitable foundation for the charcoal metro wall tiles. The bath-area boxing was modified where required, while sections of the walls and ceiling were filled and patched to create a clean finish. New architrave, skirting and a threshold were also fitted.
Flooring and Downstairs Toilet
The main bathroom floor was strengthened and prepared using 18mm and 5.5mm plywood before the new LVT flooring was installed. Self-levelling compound was applied within the downstairs toilet to produce a smooth and stable floor surface.
Fireplace and Plastering Works
An existing fireplace was blocked while retaining the area for use as practical storage. The altered fireplace was then professionally plastered, and the chimney pot was covered using the access equipment provided. The former splashback area in the downstairs toilet was also plastered where required.
Electrical Works
The electrical installation included a new extractor fan and isolator, four new downlights in the main bathroom and one in the downstairs toilet. New light switches were installed, and the redundant bathroom mirror light connection was safely blanked off. Part P certification was provided for the completed electrical work.
Together, the works created a smart and practical bathroom with charcoal metro tiles, dark shaker-style cabinetry, chrome fittings and warm LVT flooring, alongside coordinated improvements to the downstairs toilet and surrounding areas.

Bathroom and Cloakroom Renovation

Contemporary Classic

Approximately 4 weeks

St. Lawrence Park, Chepstow, Gwent