Project Overview
This project involved the complete renovation of an existing bathroom on St Georges Road in Cheltenham. The work covered decommissioning, plumbing, construction, tiling, flooring, fitted units, decoration and electrical improvements.
Bathroom and Plumbing Works
The existing bathroom was decommissioned before the first- and second-fix plumbing work was completed. The finished room was fitted with a shower-over-bath arrangement, WC, vanity basin and coordinated brushed-brass fittings.
Construction and Tiling
A new stud-wall framework was constructed to form the revised bathroom layout and create practical recessed storage niches. The walls were finished with soft marble-effect tiles, while complementary checkerboard tiles were installed across the floor.
Units and Finishing Works
New bathroom units were installed to provide practical storage and a coordinated finish. New architrave, skirting and a threshold were also fitted before the remaining surfaces and woodwork were prepared and painted.
Electrical Works
The electrical installation included a new bathroom light and light switch, an upgraded extractor fan, an illuminated LED mirror and coordinating mirror and wall lighting. Integrated lighting was also installed within the recessed niches. Part P certification was provided for the completed electrical work.
Together, the works transformed the bathroom into an elegant and practical space, combining marble-effect finishes, softly coloured flooring, illuminated storage and warm brushed-brass details.

Complete Bathroom Renovation

Contemporary Classic

Approximately 3 weeks

Cheltenham, Gloucestershire