Project Overview
This project involved the complete renovation of an existing bathroom on Dryleaze Road in Bristol. The work covered decommissioning, plumbing, construction, wall and floor finishes, plastering, decoration and electrical alterations.
Bathroom and Plumbing Works
The existing bathroom was decommissioned before the first-fix plumbing and soil-stack modifications were completed. The new sanitary fittings were then installed and connected during the second-fix stage, including a freestanding bath, basin, WC and walk-in shower. Silicone finishing was applied where required to provide clean, watertight edges.
Construction and Tiling
New pipework boxing was constructed to conceal the bathroom services and create a more refined finished appearance. A recessed niche was formed within the shower area to provide practical storage without disrupting the clean layout. Backer boards and plasterboard were installed before the new wall and floor tiles were fitted.
Flooring, Plastering and Decoration
New flooring was installed to complement the rich teal wall tiles and warm brushed-brass finishes. The walls and ceiling were professionally plastered, with the existing loft hatch decommissioned and the ceiling overboarded to produce a smooth, uninterrupted surface. The remaining walls and ceiling were prepared and painted.
Door and Ventilation Alterations
The direction in which the bathroom door opened was modified to improve access and make better use of the available space. A new opening was also created for the extractor fan to provide effective bathroom ventilation.
Electrical Works
The electrical installation included alterations for a new extractor fan and isolator, new ceiling lighting and light switch, and a new electric towel rail. Part P certification was provided for the completed electrical work.
Together, the works transformed the bathroom into a distinctive contemporary space, combining rich teal finishes, brushed-brass details, practical storage and carefully integrated bathing and showering facilities.

Complete Bathroom Renovation

Contemporary Boutique

Approximately 3 weeks

Bristol, Avon